E
Engineering
Survey, structural assessment, hinge and delay design, vibration limits, method statements and as-built close-out. Signed by a mining engineer.
Track record
Capacity, delivery, HSE and organisation. These are the numbers we will stand behind at pre-qualification. Lost-time registers, insurance limits and ISO manuals are issued to the named principal — they are not used as advertising.
Capacity
256 m
Maximum height handled
RCC chimney, Angul. 50 m shaft width.
1.5 lakh m³+
RCC demolished
Chimneys, cooling towers, tanks, halls, high-rise. Signed BOQ on request.
8,000 MT+
Steel handled
Conveyors, silos, process frames. Tonnes from the job file on request.
13
Owned plant units
Long-reach, excavators, crane, loaders, tippers, trailers.
Delivery
10 lakh+
Manhours
Directly employed crews. Survey to firing.
8
Cooling towers, one campaign
KTPS Kothagudem. Four shells in one window. Operating station.
5°
Tightest fall corridor
NTPC Kanti. 135 m chimney, 40 m from a live ID fan.
13+
Published projects
Power, cement, urban and process. Add new jobs as they close.
HSE
PESO
Explosives chain
Magazine, transport, charging, firing and record. No freelance shots.
Live plant
Adjoining units kept in service
Kanti, KTPS and other operating stations. Vibration and exclusion in the method statement.
On award
Insurance to the named principal
CAR / WC / TPL certificates issued to the EPC or owner on award. Numbers not published here.
PQQ
HSE registers
Lost-time, near-miss and toolbox records issued at pre-qualification. Not displayed as marketing.
Organisation
2020
Company incorporated
EXIQUDE Private Limited. Practice in implosion and controlled blasting from 2003.
7
Offices
Jaipur, Bharatpur, Katni, Jhansi, Awarpur, Jafrabad, Jharsuguda.
2
Directors
Dr. Anand Sharma — engineering. Anshul Mudgal — operations.
CIN / GST
Registered contractor
U14290RJ2020PTC068504 · 08AAFCE8649B1ZK.
Organisation
The same four functions an EPC client already runs. We operate them today on demolition packages. That is the foundation for larger industrial takedown contracts.
E
Survey, structural assessment, hinge and delay design, vibration limits, method statements and as-built close-out. Signed by a mining engineer.
P
PESO explosives, detonators, plant, hired lift and consumables. Magazine and transport under company control. No informal supply.
C
Directly employed crews, owned plant, exclusion, demolition, debris and handover. One sequence, one site in-charge.
Q
Exclusion, PPV, air-blast, PESO paperwork, toolbox talks and punch-list close-out. Safety is written into the method, not added after the shot.
Direction
01
Nominated to owners and EPCs for chimneys, cooling towers, process units and high-rise. We already run engineering, procurement of explosives and plant, and construction with our own people.
02
Single-point responsibility from survey through demolition and handover on industrial takedown. One contract, one method statement, one close-out file.
03
Full engineering, procurement and construction packages for plant demolition. ISO manuals, bonding, insurance limits and HSE registers sit in pre-qualification. They are updated as the organisation scales. We do not advertise certificates we have not issued.