E
Engineering
Survey, structural assessment, hinge and delay design, vibration limits, method statements and as-built close-out. Signed by a mining engineer.
For EPC contractors
Nominated subcontractor to EPCs who cannot put a labour contractor next to a live kiln. AFCONS, ISGEC, APCO, Shapoorji Pallonji are on the published list. The pack is numbered.
Functions
E
Survey, structural assessment, hinge and delay design, vibration limits, method statements and as-built close-out. Signed by a mining engineer.
P
PESO explosives, detonators, plant, hired lift and consumables. Magazine and transport under company control. No informal supply.
C
Directly employed crews, owned plant, exclusion, demolition, debris and handover. One sequence, one site in-charge.
Q
Exclusion, PPV, air-blast, PESO paperwork, toolbox talks and punch-list close-out. Safety is written into the method, not added after the shot.
01
Nominated to owners and EPCs for chimneys, cooling towers, process units and high-rise. We already run engineering, procurement of explosives and plant, and construction with our own people.
02
Single-point responsibility from survey through demolition and handover on industrial takedown. One contract, one method statement, one close-out file.
03
Full engineering, procurement and construction packages for plant demolition. ISO manuals, bonding, insurance limits and HSE registers sit in pre-qualification. They are updated as the organisation scales. We do not advertise certificates we have not issued.
Pre-qualification file
Legal
CIN U14290RJ2020PTC068504 · GST 08AAFCE8649B1ZK · India.
Explosives
Magazine, transport, charging, firing and record. No freelance shots.
Direction
Dr. Anand Sharma, PhD · DIN 02000423. Anshul Mudgal, operations · DIN 08721549.
People
Ten lakh-plus manhours on the published record. Not a labour contractor.
Plant
Long-reach, excavators, crane, loaders, tippers, trailers. Hired plant listed separately.
Centres
Jaipur, Bharatpur, Katni, Jhansi, Awarpur, Jafrabad, Jharsuguda.
Envelope
Angul chimney, 50 m shaft width. 1.5 lakh m³+ RCC · 8,000 MT+ steel.
Insurance
CAR / WC / TPL certificates from our team. Policy numbers are not published here.
Insurance certificates (CAR / WC / TPL) are made out to the named EPC on award. We do not publish policy numbers on the open web. Signed BOQ quantities — manhours, RCC, steel — from the job file on request.
Company, GST, the NIT if you have one. Our team answers in one to two business days. No public sign-in — named correspondence only.