PESO first
Charging, storage, transport and firing follow Indian explosives regulations. No freelance shots.
Safety
We do not sell “safety culture” posters. We sell a corridor, a vibration file, and a plant that is still running after the shot.
256 m
Height handled
Angul, Odisha — 50 m shaft width, felled as drawn.
10 lakh+
Manhours
Own crews. Survey, hinge, charge, fire — not a labour contractor.
1.5 lakh m³+
Volume of RCC
Industrial shells on the published record. Signed BOQ from India.
8,000 MT+
Steel handled
Conveyors, silos, process frames. Tonnes from the job file on request.
Charging, storage, transport and firing follow Indian explosives regulations. No freelance shots.
Every live-plant job starts with a vibration and air-blast ceiling. We design to it and we record it.
The hinge, the delay and the exclusion are drawn before a hole is drilled. Replay the schematic on Method.
On the high-stakes live-plant record: no lost-time incidents. Neighbouring units stay energised.
Owners, insurers and the press stand on a marked line. Featured jobs are filmed in full.
Robots, diamond wire, non-explosive breaking — used when the plant’s vibration budget forbids a shot.