Safety

Zero downtime is a safety number.

We do not sell “safety culture” posters. We sell a corridor, a vibration file, and a plant that is still running after the shot.

256 m

Height handled

Angul, Odisha — 50 m shaft width, felled as drawn.

10 lakh+

Manhours

Own crews. Survey, hinge, charge, fire — not a labour contractor.

1.5 lakh m³+

Volume of RCC

Industrial shells on the published record. Signed BOQ from India.

8,000 MT+

Steel handled

Conveyors, silos, process frames. Tonnes from the job file on request.

PESO first

Charging, storage, transport and firing follow Indian explosives regulations. No freelance shots.

A number, not a vibe

Every live-plant job starts with a vibration and air-blast ceiling. We design to it and we record it.

Corridor before charge

The hinge, the delay and the exclusion are drawn before a hole is drilled. Replay the schematic on Method.

Zero lost time

On the high-stakes live-plant record: no lost-time incidents. Neighbouring units stay energised.

Witnessed

Owners, insurers and the press stand on a marked line. Featured jobs are filmed in full.

Hybrid when blasting cannot

Robots, diamond wire, non-explosive breaking — used when the plant’s vibration budget forbids a shot.

What we put in the file

  • Structural survey and live-asset map
  • Vibration and air-blast limits agreed with the plant
  • Charging pattern and delay sequence
  • Exclusion, viewing line, and firing protocol
  • Post-shot PPV record and photographic / film archive
  • Fleet list, manhours, RCC and steel for the tender file
WhatsAppCallEmail