Live plant
Hinge, implosion, sequence or hybrid — after the vibration number.
A drawing or a phone photo is enough to start. The team answers in 1–2 days.

Explosives · Implosion · Quarry · Demolition
We bring massive structures down while the neighbouring plant keeps powering on — chimneys, cooling towers, process units and urban towers, felled to a drawing, not a guess.
Directed by Dr. Anand Sharma, PhD. Mining engineers, MBM Jodhpur (1993). India.
Open the theatreThree desks
Asset owners
Chimney, tower, tank or hall inside an operating plant — or a tower in a street. Send a drawing. Get a fall corridor, a vibration budget, and a filmed method.
Brief the engineersEPC & subcontractors
CIN, GST, PESO chain, own crews, owned plant, signed manhours, and a dossier that looks like your job. The pack leaves the same day.
Open the EPC deskEngineers & operators
Ten lakh-plus manhours of own employed people. Blast design, site, HSE, magazine, survey, plant. Seven centres. Field work, a drawing behind it.
See open rolesEnvelope
Structure, height, nearest live asset. Instant method — not a quote. The desk still needs the drawing.
Live plant
A drawing or a phone photo is enough to start. The team answers in 1–2 days.
Live schematic · 256 m · 5° corridor
How a job runs
Click a stage. The schematic is the product — a chimney rotating into a five-degree corridor at a live plant.
Legal
EXIQUDE Private Limited
Explosives
PESO-compliant chain
Direction
Mining engineer on the design
People
Own employed crews
256 m
Height handled
Angul, Odisha — 50 m shaft width, felled as drawn.
10 lakh+
Manhours
Own crews. Survey, hinge, charge, fire — not a labour contractor.
1.5 lakh m³+
Volume of RCC
Industrial shells on the published record. Signed BOQ from India.
8,000 MT+
Steel handled
Conveyors, silos, process frames. Tonnes from the job file on request.
Prequalification
Thirteen owned units. Own employed crews. Volume of RCC and steel on the published record. 256 m is the height of structure handled. Signed quantities from our team.
Witnessed · filmed · signed off
Multiple completed jobs playing at once — mute, looping, from the house channel. Click a tile to make it the lead. Sound is off until you ask.

Kanti, Muzaffarpur
135 m chimney · 5° corridor

Kothagudem
Eight cooling towers
14 films looping · mute until asked
Primary structures

RCC stacks to 250 m+
Precision hinge-cut designs for industrial chimneys. We guarantee a fall corridor to protect live ID fans and switchyards sitting metres from the shaft.

Hyperbolic NDCT shells
Hyperbolic shell felling with millisecond delays. Multiple towers in one outage window, vibration and air-blast held to station limits.

Surgical removal in live yards
RCC and steel storage units planned to miss adjacent conveyors, kilns, HT lines and pump houses by metres.

Cement and chemical plants
Twin preheater frames, reject crushers, clinker halls — weakened to drop inside their own footprint while mills keep turning.

Designed collapse in a street
Controlled implosion of occupied-neighbourhood towers. Mass into the footprint. Houses metres away stay standing.

Fragmentation, not theatre
Flyovers, bridges and heavy RCC foundations taken down with controlled fragmentation and minimal traffic impact.
Atlas
Power, cement, metals, urban. Every mark is a job where the neighbouring unit stayed live — or the house next door stayed standing.
Selected dossier
Hover a mark. Every pin is a constrained felling — live plant, urban street, or a record shaft.
Click any mark for film, constraints and method.
Featured dossiers
Record heightFilm256 mIndustrial · Angul · Odisha
One of India's tallest explosive fellings. 50 m shaft width.
5° corridorFilm135 mNTPC Kanti · Bihar
40 m from an active ID fan and switchyard.
4 at onceFilmKTPS Kothagudem · Telangana
Operating station. Air-blast and vibration caps.
FilmAlpha Serene · Kerala
Houses 9 m from the plot.
Direction
Director · Pioneer, implosion & controlled blasting
Mining engineer, MBM Jodhpur, 1993. DIN 02000423. From 2003, overall charge of implosion, demolition, mining and controlled blasting at EXIQUDE — client liaison, blast design, plant deployment. Prior: Special Blast Ltd, Rajasthan Explosives and Chemicals, Bharat Explosives. Designs hinge cuts, delay sequences and fall corridors for live industrial plants.
Director · Operations
Director, DIN 08721549. Holds the operating line: crews, plant, magazines and the seven centres. The people who survey the structure, set the method and stand at the firing are EXIQUDE people.
Trusted by industry. Proven on site.
“EXIQUDE's precision in felling our 135 m chimney next to an active unit was world-class. Zero downtime, total safety.”
“The implosion of our coal conveyor trestles was a masterclass in engineering. Silos remained perfectly intact.”
“Downing eight cooling towers in a single window required immense coordination. EXIQUDE delivered exactly as planned.”
Field notes
6 min · 2025-11-12
How a 135 m RCC stack at NTPC Kanti was hinged into a five-degree corridor, forty metres from a live ID fan.
5 min · 2025-12-03
Why cooling towers are felled as a sequence, and how KTPS took eight — including four at once — inside an operating station.
7 min · 2026-01-18
A practical PQQ: CIN, GST, PESO, own crews, owned plant, signed manhours, and a film of a job that looks like yours.

For owners, EPCs and governments worldwide
Chimney, tower, tank, hall or high-rise. Live plant or urban street. Our team answers in one to two business days.