
The constraint
A 35 m tank boxed in by a surface-water tank, canteen, mechanical workshop and an MPEV high-tension line.
The drawing
Direction was the only degree of freedom. Charging and hinge designed so the tank fell into a sacrificial workshop already planned as the landing.
The result
Fall exactly as drawn. HT line, canteen, pump house saved.
Same structure class
