
The constraint
Simultaneous demolition of eight natural-draft cooling towers at an operating station, including four at once — a first in India.
The drawing
Sequential felling on millisecond delays. Collapse staggered so air-blast and ground vibration stayed inside station limits.
The result
Eight shells down in one window. Plant limits held.
Same structure class