The constraint
Sequential felling of two industrial stacks inside a single outage window.
The drawing
Planned sequential felling. Both stacks downed inside the window.
The result
Station impact limited to the booked outage.
Same structure class

Sequential felling of two industrial stacks inside a single outage window.
Planned sequential felling. Both stacks downed inside the window.
Station impact limited to the booked outage.